Bezmaksas piegāde pasūtījumiem virs 29€

  • check 10+ miljoni grāmatu
  • check Jaunumi katru dienu
  • check Vairāk nekā 1 miljons klientu mums uzticas
  • check Labas cenas un atlaides
  • check Piegāde visā Eiropā

Measuring Time: Improving Project Performance Using Earned Value Management - Mario Vanhoucke

angļu valoda
2012-03-07
118,57 € 169,38 €

-30% ar kodu BOOKS

Piegādātāja noliktavā

Piegāde 12-18 darba dienu laikā

30 dienu atgriešanas politika

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project¿s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions d ... Pilns apraksts

Jums varētu patikt arī

Aprašymas

Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project¿s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.

Vairāk informācijas

Autors Mario Vanhoucke
Izdevējs Springer US
Series International Series in Operations Research & Management Science
Izlaides gads 2012
Vāka tips Mīkstais vāks
EAN 9781461425373
Rakstiet savu atsauksmi
Jūs vērtējat: Measuring Time: Improving Project Performance Using Earned Value Management
Jūsu novērtējums:

Goodreads atsauksmes

118,57 € 169,38 €