Bezmaksas piegāde pasūtījumiem virs 29€

  • check 10+ miljoni grāmatu
  • check Jaunumi katru dienu
  • check Vairāk nekā 1 miljons klientu mums uzticas
  • check Labas cenas un atlaides
  • check Piegāde visā Eiropā

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution - Khalid S. Al-Gahtani

angļu valoda
2010-12-13
79,59 € 113,70 €

-30% ar kodu BOOKS

Piegādātāja noliktavā

Piegāde 12-18 darba dienu laikā

30 dienu atgriešanas politika

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool ... Pilns apraksts

Jums varētu patikt arī

Aprašymas

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Vairāk informācijas

Autors Khalid S. Al-Gahtani
Izdevējs LAP LAMBERT Academic Publishing
Izlaides gads 2010
Vāka tips Mīkstais vāks
EAN 9783843350709
Rakstiet savu atsauksmi
Jūs vērtējat: Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and IT Solution
Jūsu novērtējums:

Goodreads atsauksmes

79,59 € 113,70 €